5B Ward

5b ward renovation 

WestEast worked with the Department of Veterans Affairs to renovate the 5th floor of Audie L. Murphy Memorial hospital. The project involved 18 patient rooms, 13 of which were fully replaced and 5 of which were renovated. These rooms take advantage of state of the art equipment such as new patient headwalls, patient lift systems, nurse call and code blue systems, and the new Bed Ready equipment, which aids staff in tracking patient care. The new Herman Miller nurse stations are located to have direct supervision over the patient rooms, which include windows in the corridor walls and sliding glass doors.

PROJECT FACTS

LOCATION: San Antonio, TX  

CLIENT: South Texas Veterans Health Care System 

SIZE: 10,650 SF

SERVICES: Architecture, Interior Design, Cost Analysis/Estimating

<PREVIOUS  / NEXT>